Jansen&Heuning has installed a 16 meter high silo in Hoogezand (NL) within 8 hours. This was possible, because the silo was completely designed in 3D and prefabricated with laser-cut parts. But also because the silo was aligned and installed with a top team of three mechanics and professionals of Mammoet. As such, the total construction could continue undisturbed. The silo with a capacity of 180 tons is part of a new kiln system. Our client NEG Glass Fiber will start to use the silo soon to increase the producten of high-quality glass fibers.
Read more