New address Delft Solids Solutions

icon.highlightedarticle.dark Tech & Production
Last modified: 8 May 2023

Delft Solids Solutions has recently moved to a new location in Wateringen. Beside new offices and a new laboratory space, divided over three different labs with a total area of 250 m2, we now also posess a so-called Field Testing Area. This latter facility has an area of 200 m2 and an effective height of 6 meters. Here, larger pilot plant set-ups can be built and researched, which can mimic the true situation in the factory.

Coupled to our laboratory facilities and our expertise, this enables to offer the best-possible solutions in the area of particle characterization.

Written by

Delft Solids Solutions B.V.

Well-equipped contract research laboratory with focus on the physical properties and behaviour of solids. Shear testing, flowability investigations, dustiness assessment, segregation of powders, attrition and strength, consolidation, stickiness testing. We... Read more