In April 2016 <b>TBK spillage control bv</b> has supplied two CEN-TRAX SO-2000 return trackers to an open pit mine in the north of Finland. The return trackers are installed on two mobile conveyor belt installations, each with a belt width of 2000 mm. Through the mobile conveyor installations a fixed conveyor belt installation is fed by several belt conveyors. Due to the uneven terrain, mistracking of both mobile conveyors caused unplanned stoppages of the installation. Both CEN-TRAX return trackers are in operation for one year without a single problem. Two belt trackers have increased the availability of the installation by 30%!

Written by