Lutze Conveying BeLux finished at the end of November a job at a customer in the port of Ghent where we have installed 22 meters of our ”Safe Load Systems” on a belt of 1.000 mm width. We also adapted 3 loading points and we used ceramics on the inside as you can see in the pictures. Great job done by our German and Belgian technicians